Facilities at RAF Lossiemouth in Scotland are being upgraded as part of investments costing more than £400 million altogether. The Moray base is home to four Typhoon fighter jet squadrons, a new fleet of Poseidon Maritime Patrol aircraft, IX (Bomber) Squadron and an RAF regiment squadron.

Runway Upgrades

Work to resurface two runways has been carried out as part of a £75million upgrade, while the intersection between them has been stripped, strengthened and resurfaced. The refurbishment began in late 2019, as part of a contract awarded to VolkerFitzpatrick Ltd by the Defence Infrastructure Organisation.

Facilities at RAF Lossiemouth in Scotland are being upgraded as part of investments costing more than £400 million altogether. The Moray base is home to four Typhoon fighter jet squadrons, a new fleet of Poseidon Maritime Patrol aircraft, IX (Bomber) Squadron and an RAF regiment squadron.

Runway Upgrades

Work to resurface two runways has been carried out as part of a £75million upgrade, while the intersection between them has been stripped, strengthened and resurfaced. The refurbishment began in late 2019, as part of a contract awarded to VolkerFitzpatrick Ltd by the Defence Infrastructure Organisation.

Facilities at RAF Lossiemouth in Scotland are being upgraded as part of investments costing more than £400 million altogether. The Moray base is home to four Typhoon fighter jet squadrons, a new fleet of Poseidon Maritime Patrol aircraft, IX (Bomber) Squadron and an RAF regiment squadron.

Runway Upgrades

Work to resurface two runways has been carried out as part of a £75million upgrade, while the intersection between them has been stripped, strengthened and resurfaced. The refurbishment began in late 2019, as part of a contract awarded to VolkerFitzpatrick Ltd by the Defence Infrastructure Organisation.

Facilities at RAF Lossiemouth in Scotland are being upgraded as part of investments costing more than £400 million altogether. The Moray base is home to four Typhoon fighter jet squadrons, a new fleet of Poseidon Maritime Patrol aircraft, IX (Bomber) Squadron and an RAF regiment squadron.

Runway Upgrades

Work to resurface two runways has been carried out as part of a £75million upgrade, while the intersection between them has been stripped, strengthened and resurfaced. The refurbishment began in late 2019, as part of a contract awarded to VolkerFitzpatrick Ltd by the Defence Infrastructure Organisation.

REX Civil Engineering were engaged by Volker Fitzpatrick to provide an Engineering team to deliver the Engineering elements associated with laying Pavement Quality Concrete using 3D Model control.  REX supplied a team of four Engineers on rotation to allow for 7 day working while in full possession of both aircraft runways.

Duties include but not limited to:

  • Calibration of survey equipment and control systems

  • Validate and check control systems

  • Receive and process design information for setting out

  • Setting line and level of shuttering for hand lay sections for concrete pavement

  • Calibrate and set up machine control systems

  • Progressive manual line and level checks throughout the paving operations

  • Provide Engineering support to concrete surfacing team

  • Complete as-built surveys and compile data for submission to design team

  • Proactive review of design information to ensure the issued data covers the full extents of the programmed works

  • Liaise with design team regarding issues with design model and assist in resolving issues

RAF Lossiemouth

Client

Volker Fitzpatrick

Aviation (Civils)

Sector

Location

Inverness, Scotland

Project Value

c. £75m

Project Description

Facilities at RAF Lossiemouth in Scotland are being upgraded as part of investments costing more than £400 million altogether. The Moray base is home to four Typhoon fighter jet squadrons, a new fleet of Poseidon Maritime Patrol aircraft, IX (Bomber) Squadron and an RAF regiment squadron.

Runway Upgrades

Work to resurface two runways has been carried out as part of a £75million upgrade, while the intersection between them has been stripped, strengthened and resurfaced. The refurbishment began in late 2019, as part of a contract awarded to VolkerFitzpatrick Ltd by the Defence Infrastructure Organisation.

REX Civil Engineering - Scope of Work

REX Civil Engineering were engaged by Volker Fitzpatrick to provide an Engineering team to deliver the Engineering elements associated with laying Pavement Quality Concrete using 3D Model control.  REX supplied a team of four Engineers on rotation to allow for 7 day working while in full possession of both aircraft runways.

Duties include but not limited to:

  • Calibration of survey equipment and control systems

  • Validate and check control systems

  • Receive and process design information for setting out

  • Setting line and level of shuttering for hand lay sections for concrete pavement

  • Calibrate and set up machine control systems

  • Progressive manual line and level checks throughout the paving operations

  • Provide Engineering support to concrete surfacing team

  • Complete as-built surveys and compile data for submission to design team

  • Proactive review of design information to ensure the issued data covers the full extents of the programmed works

  • Liaise with design team regarding issues with design model and assist in resolving issues

CARD%202_edited.jpg

Further Information & References

Further information relating to the works carried out by REX Civil Engineering at RAF Lossiemouth and our capabilities relating to surfacing operations and 3D model control is readily available. At REX, we are always open to provide client references giving a first hand account of the positive experiences encountered from our professional services.

 